Advancing Data Center Construction West 2027: 60 exhibitors & sponsors found
We've found 60 exhibitors and sponsors for Advancing Data Center Construction West 2027 so far, heading to TBA from 9 countries. Construction & Contracting is the biggest block on the floor at 12% of the companies we matched, ahead of building materials and industrial machinery & equipment. 45 of them were also at Advancing Data Center Construction West 2026; 40 from that list aren’t on this one yet.
- 60
- exhibitors & sponsors found so far as of 7 Nov 2026
- 9
- headquarters countries most from United States
- 53%
- of Advancing Data Center Construction West 2026's exhibitors are back 45 companies
- 23
- sectors represented
The show floor, by sector
Each square is a company we matched to a profile, grouped by its main sector. Construction & Contracting makes up 12% of Advancing Data Center Construction West 2027; the gray block is the other 17 sectors combined.
- Construction & Contracting 5 · 12%
- Building Materials 4 · 9.8%
- Industrial Machinery & Equipment 3 · 7.3%
- Freight, Trucking & Logistics 3 · 7.3%
- Market Research & Insights 3 · 7.3%
- Utilities & Power 2 · 4.9%
- Everything else 21 · 51%
Each square is one company.
Who exhibits at Advancing Data Center Construction West
Company size and headquarters for the 46 exhibitors we matched. A mid-market floor: 43% have 51–1,000 employees.
45 came back from 2026
Comparing Advancing Data Center Construction West 2027’s list with Advancing Data Center Construction West 2026. For organisers, the companies that haven’t re-booked yet are the warmest list there is — they already know the show.
MIFABBuilding Materials · 11–50 staff · United States
Wildeck, IncIndustrial Machinery & Equipment · 201–500 staff · United States
BoMetals, IncBuilding Materials · 11–50 staff · United States
XylemIndustrial Machinery & Equipment · 10,001+ staff · United States
JE Dunn ConstructionConstruction & Contracting · 5,001–10,000 staff · United States
Gates CorporationIndustrial Machinery & Equipment · 10,001+ staff · United States
Salt River ProjectUtilities & Power · 5,001–10,000 staff · United States
Holcim Building EnvelopeBuilding Materials · 1,001–5,000 staff · United States
Hanson WadeMarket Research & Insights · 201–500 staff · United Kingdom
Hanson Wade GroupMarket Research & Insights · 201–500 staff · United Kingdom
Virginia Transformer CorpElectrical & Electronics Manufacturing · 5,001–10,000 staff · United States
ايبيك - EPECManagement & Strategy Consulting · 11–50 staff · Saudi Arabia
Onsite Construction Management SoftwareEnterprise Software · 11–50 staff · India
Octave ApparelsRetail Apparel and Fashion · 1,001–5,000 staff · India
Commerce ControlsManagement & Strategy Consulting · 201–500 staff · United States
- CRH America, Inc.Glass, Ceramics and Concrete Manufacturing · 1,001–5,000 staff
Advancing Data Center Construction West 2027 exhibitor list
The first 25 of the 60 we've found: sponsors and exhibitors from the show’s core sectors first. The full list adds every company, its website, and the people to contact.
| Company | Industry | Size | HQ | Role |
|---|---|---|---|---|
Landstar landstar.com | Freight, Trucking & Logistics | 1,001–5,000 | United States | Sponsor |
Kingspan Group kingspan.com | Building Materials | 10,001+ | Ireland | Sponsor |
Buildots buildots.com | Construction & Contracting | 201–500 | Israel | Sponsor |
Clark Pacific clarkpacific.com | Construction & Contracting | 501–1,000 | United States | Sponsor |
Viking Group, Inc. vikinggroupinc.com | Building Materials | 1,001–5,000 | United States | Sponsor |
Sabre Industries, Inc. sabreindustries.com | Utilities & Power | 1,001–5,000 | United States | Sponsor |
Maddox Industrial Transformer maddox.com | Industrial Machinery & Equipment | 201–500 | United States | Sponsor |
VoltaGrid | Utilities & Power | 1,001–5,000 | — | Sponsor |
Frazier Industrial Company frazier.com | Industrial Machinery & Equipment | 501–1,000 | United States | Sponsor |
Fibergrate Composite Structures fibergrate.com | Building Materials | 201–500 | United States | Sponsor |
Stallion stallion.ca | Freight, Trucking & Logistics | 51–200 | Canada | Sponsor |
MEI Industrial Solutions meiindustrialsolutions.com | Industrial Machinery & Equipment | 1,001–5,000 | United States | Sponsor |
Locke Solutions lockesolutions.com | Building Materials | 201–500 | United States | Sponsor |
Planera Inc planera.io | Construction & Contracting | 11–50 | United States | Sponsor |
Stratus stratus.build | Construction & Contracting | 51–200 | United States | Sponsor |
Hubbell thinkhubbell.com | Market Research & Insights | 2–10 | United States | Sponsor |
Interstate Gratings interstategratings.com | Construction & Contracting | 51–200 | United States | Sponsor |
CrewLink crewlink.com | Freight, Trucking & Logistics | 51–200 | — | Sponsor |
Hanson Wade hansonwade.com | Market Research & Insights | 201–500 | United Kingdom | — |
Hanson Wade Group hansonwadegroup.com | Market Research & Insights | 201–500 | United Kingdom | — |
Sika sika.com | Chemicals & Materials | 10,001+ | Switzerland | Sponsor |
Blueground theblueground.com | Property Management & Leasing | 501–1,000 | United States | Sponsor |
Southwire Company southwire.com | Electrical & Electronics Manufacturing | 5,001–10,000 | United States | Sponsor |
Virginia Transformer Corp vatransformer.com | Electrical & Electronics Manufacturing | 5,001–10,000 | United States | Sponsor |
CharterUP charterup.com | Passenger Transport & Mobility | 201–500 | United States | Sponsor |
Book a 15-minute call. We'll walk you through the full list and how we can help you reach the right people before the show.
Book a call →Advancing Data Center Construction West exhibitors also show up at
The events sharing the most exhibitors with Advancing Data Center Construction West 2027. 17% of the companies we matched here also exhibit at NECA Convention and Trade Show 2026.
What people do with this list
Book meetings before Advancing Data Center Construction West opens
We'll walk you through all 60 companies we've found and the decision-makers at each, then RocketSDR can research every account and write the outreach. Start now and you’re in their calendar before the show floor fills up.
Find sponsors among companies that exhibit at shows like this
Exhibitors at Advancing Data Center Construction West and NECA Convention and Trade Show already budget for events in your space. We find the ones that fit your audience and the person who signs off on sponsorship.
Where Advancing Data Center Construction West exhibitors advertise
Of the 46 exhibitors and sponsors we matched to a company profile, how many carry each advertising platform’s tag on their website (tag manager or live page). Each link opens the full list of companies using that platform.
More construction & contracting shows
All construction & contracting shows · Everything in March 2027
Advancing Data Center Construction West 2027: quick answers
How many companies exhibit at Advancing Data Center Construction West 2027?
We've found 60 companies exhibiting at or sponsoring Advancing Data Center Construction West 2027 so far, as of 7 Nov 2026, from public exhibitor directories, sponsor pages and the companies' own announcements. The organiser's official list may include more. Of those we found, 58 are listed as sponsors; the rest come from combined exhibitor and sponsor lists. We matched 46 of them to a company profile with industry, size and headquarters.
What industries exhibit at Advancing Data Center Construction West 2027?
Among the 41 exhibitors we matched, the largest groups are Construction & Contracting (12%), Building Materials (9.8%), Industrial Machinery & Equipment (7.3%). In total they span 23 sectors.
Where are Advancing Data Center Construction West exhibitors from?
Exhibitors we matched are headquartered in 9 countries. The most represented are United States (31), India (2), United Kingdom (2).
How many Advancing Data Center Construction West 2026 exhibitors returned for 2027?
45 companies from Advancing Data Center Construction West 2026's list of 85 are on the Advancing Data Center Construction West 2027 list so far (53%). 15 companies are new this year, and 40 are not listed yet.
Turn the Advancing Data Center Construction West list into meetings
RocketSDR finds the right person at every exhibitor, researches each account, and runs personalised outreach across email and LinkedIn — so you walk into the show with meetings booked.