Excellence in Data Center Construction, Design, and Engineering Forum 2027: 31 exhibitors & sponsors
Excellence in Data Center Construction, Design, and Engineering Forum 2027 has 31 exhibitors and sponsors listed so far, heading to Dallas, United States from 6 countries. Building Materials is the biggest block on the floor at 19% of the companies we matched, ahead of industrial machinery & equipment and engineering & technical services. 3 of them were also at Excellence in Data Center Construction, Design, and Engineering Forum 2026; 41 from that list aren’t on this one yet.
- 31
- exhibitors & sponsors listed so far as of 7 Nov 2026
- 6
- headquarters countries most from United States
- 6.8%
- of Excellence in Data Center Construction, Design, and Engineering Forum 2026's exhibitors are back 3 companies
- 15
- sectors represented
The show floor, by sector
Each square is a company we matched to a profile, grouped by its main sector. Building Materials makes up 19% of Excellence in Data Center Construction, Design, and Engineering Forum 2027; the gray block is the other 9 sectors combined.
- Building Materials 4 · 19%
- Industrial Machinery & Equipment 4 · 19%
- Engineering & Technical Services 1 · 4.8%
- HVAC & Refrigeration 1 · 4.8%
- Nonprofits & NGOs 1 · 4.8%
- Chemicals & Materials 1 · 4.8%
- Everything else 9 · 43%
Each square is one company.
Who exhibits at Excellence in Data Center Construction, Design, and Engineering Forum
Company size and headquarters for the 23 exhibitors we matched. A mid-market floor: 50% have 51–1,000 employees.
3 came back from 2026
Comparing Excellence in Data Center Construction, Design, and Engineering Forum 2027’s list with Excellence in Data Center Construction, Design, and Engineering Forum 2026. For organisers, the companies that haven’t re-booked yet are the warmest list there is — they already know the show.
Cla-ValIndustrial Machinery & Equipment · 501–1,000 staff · United States
TROX UK LtdHVAC & Refrigeration · 51–200 staff · United Kingdom
XylemIndustrial Machinery & Equipment · 10,001+ staff · United States
FastenalIndustrial Machinery & Equipment · 10,001+ staff · United States
QXOBuilding Materials · 10,001+ staff
Vulcan Materials CompanyBuilding Materials · 5,001–10,000 staff · United States
Reliable Automatic Sprinkler Co., Inc.Building Materials · 1,001–5,000 staff · United States
Maddox Industrial TransformerIndustrial Machinery & Equipment · 201–500 staff · United States
Kingspan GroupBuilding Materials · 10,001+ staff · Ireland
Core & MainBuilding Materials · 1,001–5,000 staff · United States
ProMinent GroupIndustrial Machinery & Equipment · 1,001–5,000 staff · Germany
Lochinvar, LLCHVAC & Refrigeration · 201–500 staff · United States
Omega Morgan, Inc.Industrial Machinery & Equipment · 501–1,000 staff · United States
XerxesBuilding Materials · 501–1,000 staff · United States
Excel Fluid GroupIndustrial Machinery & Equipment · 11–50 staff · United States
Nomad FuturistNonprofits & NGOs · 11–50 staff · United States
Excellence in Data Center Construction, Design, and Engineering Forum 2027 exhibitor list
The first 13 of 31: sponsors and exhibitors from the show’s core sectors first. The full list adds every company, its website, and the people to contact.
| Company | Industry | Size | HQ |
|---|---|---|---|
PPG ppg.com | Chemicals & Materials | 10,001+ | United States |
Kingspan Group kingspan.com | Building Materials | 10,001+ | Ireland |
Core & Main coreandmain.com | Building Materials | 1,001–5,000 | United States |
ProMinent Group prominent.com | Industrial Machinery & Equipment | 1,001–5,000 | Germany |
Lochinvar, LLC lochinvar.com | HVAC & Refrigeration | 201–500 | United States |
Omega Morgan, Inc. omegamorgan.com | Industrial Machinery & Equipment | 501–1,000 | United States |
Xerxes xerxes.com | Building Materials | 501–1,000 | United States |
Excel Fluid Group excelfluidgroup.com | Industrial Machinery & Equipment | 11–50 | United States |
Nomad Futurist nomadfuturist.com | Nonprofits & NGOs | 11–50 | United States |
New York Blower Company nyb.com | Industrial Machinery & Equipment | 501–1,000 | United States |
Astro Pak astropak.com | Engineering & Technical Services | 201–500 | United States |
Armatherm™ Thermal Bridging Solutions armatherm.co.uk | Building Materials | 11–50 | United Kingdom |
DEHN Americas dehn.us | Electrical & Electronics Manufacturing | 51–200 | United States |
Book a 15-minute call. We'll walk you through the full list and how we can help you reach the right people before the show.
Book a call →What people do with this list
Book meetings before Excellence in Data Center Construction, Design, and Engineering Forum opens
We'll walk you through all 31 companies and the decision-makers at each, then RocketSDR can research every account and write the outreach. Start now and you’re in their calendar before the show floor fills up.
Find sponsors among companies that exhibit at shows like this
Exhibitors at Excellence in Data Center Construction, Design, and Engineering Forum already budget for events in your space. We find the ones that fit your audience and the person who signs off on sponsorship.
Where Excellence in Data Center Construction, Design, and Engineering Forum exhibitors advertise
Of the 23 exhibitors and sponsors we matched to a company profile, how many carry each advertising platform’s tag on their website (tag manager or live page). Each link opens the full list of companies using that platform.
More engineering & technical services shows
All engineering & technical services shows · Trade shows in United States · Everything in February 2027
Excellence in Data Center Construction, Design, and Engineering Forum 2027: quick answers
How many companies exhibit at Excellence in Data Center Construction, Design, and Engineering Forum 2027?
31 companies are listed as exhibitors or sponsors at Excellence in Data Center Construction, Design, and Engineering Forum 2027 so far, as of 7 Nov 2026. We matched 23 of them to a company profile with industry, size and headquarters.
What industries exhibit at Excellence in Data Center Construction, Design, and Engineering Forum 2027?
Among the 21 exhibitors we matched, the largest groups are Building Materials (19%), Industrial Machinery & Equipment (19%), Engineering & Technical Services (4.8%). In total they span 15 sectors.
Where are Excellence in Data Center Construction, Design, and Engineering Forum exhibitors from?
Exhibitors we matched are headquartered in 6 countries. The most represented are United States (16), United Kingdom (2), Germany (1).
How many Excellence in Data Center Construction, Design, and Engineering Forum 2026 exhibitors returned for 2027?
3 companies from Excellence in Data Center Construction, Design, and Engineering Forum 2026's list of 44 are on the Excellence in Data Center Construction, Design, and Engineering Forum 2027 list so far (6.8%). 28 companies are new this year, and 41 are not listed yet.
Turn the Excellence in Data Center Construction, Design, and Engineering Forum list into meetings
RocketSDR finds the right person at every exhibitor, researches each account, and runs personalised outreach across email and LinkedIn — so you walk into the show with meetings booked.